Designing the first and second stages of the site of the readiness and support headquarters
Scope of work :

Description of services performed:
Project Manager: Ramin Raygan

The above project was assigned to Naghsh Sharestan Consulting Engineers to design a suitable space for the depot of consumables, food, clothes, etc.

The main part of this site, which has an area of ​​about 116,000 square meters, should be considered for the establishment of sheds that will be used as warehouses, and the issues of passive defense, fire standards and passenger routes of trucks and trucks and trailers from It is of great importance. Routes should be designed in such a way that there are no problems with transportation and loading and docking. Heavy vehicle parking and drivers' dormitories, scales and office-service spaces are also considered on the mentioned site.